Zhongshan Warehouse Retrofit: Fitting a Conveyor into an Older Building
The warehouse was built in 2003, with a 5.2-metre ceiling, uneven floor and a working operation that could not stop. The conveyor…
Every Kailida article filed under Warehousing — selection notes, commissioning detail and field experience from our project engineers.
The warehouse was built in 2003, with a 5.2-metre ceiling, uneven floor and a working operation that could not stop. The conveyor…
The handover between the assembly line and the warehouse is where finished goods get damaged, mixed or lost. The conveyor, the…
The last ten metres of a packaging line decide the pallet quality. Carton orientation, gap, accumulation and transfer height all…
The hub had 4,200 square metres, a 6-metre ceiling and a peak of 80,000 orders a day. The sorter was the easy part; the induction…
A sorting system is only as good as its induction. If the parcel arrives at the sorter at the wrong speed, orientation or gap, the…