Guangzhou Seat Assembly: Mixed-Model Production at 45 Seconds
Three seat variants, one line, 45-second takt. The line had to change fixtures and material without losing a cycle, and the torque…
Every Kailida article filed under Automotive Parts — selection notes, commissioning detail and field experience from our project engineers.
Three seat variants, one line, 45-second takt. The line had to change fixtures and material without losing a cycle, and the torque…
A seat line at 45 seconds is a balance problem wrapped around a heavy, bulky product. The station layout has to account for…
Traceability is not a barcode scanner at the end of the line. It is a sequence of reads, writes and interlocks that prove every…
Pressed steel parts weighing 18 kg had to move from the press to the deburring cell without a single scratch. The conveyor had to…