Zhongshan Warehouse Retrofit: Fitting a Conveyor into an Older Building
The warehouse was built in 2003, with a 5.2-metre ceiling, uneven floor and a working operation that could not stop. The conveyor…
Every Kailida article filed under Case Studies — selection notes, commissioning detail and field experience from our project engineers.
The warehouse was built in 2003, with a 5.2-metre ceiling, uneven floor and a working operation that could not stop. The conveyor…
Three seat variants, one line, 45-second takt. The line had to change fixtures and material without losing a cycle, and the torque…
A power supply maker was loading 1,200 units per shift by hand into burn-in racks. The retrofit added automatic loading, a buffer…
The hub had 4,200 square metres, a 6-metre ceiling and a peak of 80,000 orders a day. The sorter was the easy part; the induction…
A connector maker needed 300,000 units per day from a line that had to fit a 19 m bay. The answer was not a faster conveyor; it was…
Pressed steel parts weighing 18 kg had to move from the press to the deburring cell without a single scratch. The conveyor had to…