Zhongshan Warehouse Retrofit: Fitting a Conveyor into an Older Building
The warehouse was built in 2003, with a 5.2-metre ceiling, uneven floor and a working operation that could not stop. The conveyor…
4 min read
Sorting and warehouse projects where order profile, building constraints and uptime define the system more than the conveyor catalogue.
The warehouse was built in 2003, with a 5.2-metre ceiling, uneven floor and a working operation that could not stop. The conveyor…
The hub had 4,200 square metres, a 6-metre ceiling and a peak of 80,000 orders a day. The sorter was the easy part; the induction…