Walk along a well-designed assembly line and you notice the operators rarely turn around. Everything they need arrives at the end of their arm, at the moment they need it. That is not a coincidence; it is the result of four decisions made before the line was built.

Decision one: the reach envelope

The comfortable working area for a standing operator is roughly 500 mm deep and 900 mm wide, centred on the workstation. Anything outside that envelope costs a step or a twist, and a twist repeated 600 times a shift becomes a back injury and a quality defect.

Primary parts go inside 400 mm. Secondary parts and tools go between 400 and 600 mm. Anything beyond 600 mm should be replenished by a tugger or a water spider, not reached by the operator.

Decision two: container size and weight

A container should hold between 30 minutes and two hours of consumption. Less than 30 minutes and the operator spends the shift swapping boxes; more than two hours and the container is too big for the reach envelope and too heavy to lift safely.

For a part used 40 times an hour, a 60-minute container holds 40 pieces. For a part used twice an hour, the same container holds two pieces, which is not worth a dedicated location. Low-consumption parts belong in a shared rack with a kanban card, not at the station.

Keep the full container under 12 kg. Above that, the lift becomes a manual handling risk and the container will be dragged rather than lifted, which damages the rack and spills parts.

Decision three: presentation angle

Gravity flow racks present parts at 15 to 20 degrees from horizontal. Steeper and the parts jam forward; shallower and they do not slide. The angle depends on the container base: cardboard needs more, plastic totes with a smooth base need less.

At the pick face, the container should sit at 900 to 1100 mm above the floor for a standing operator, and at 700 to 900 mm for a seated one. The pick opening should face the operator, not the aisle.

Field noteA pump assembly line installed flow racks at 1,300 mm because the rack supplier's standard height was 1,300 mm. Operators were reaching above shoulder height all shift. Lowering the racks by 250 mm and shortening the legs cost less than a week of the resulting absence.

Decision four: the replenishment trigger

Two-tray kanban is the simplest system that works. Each part has two containers: one at the line, one in the supermarket. When the line container empties, the operator places the empty in the return lane and takes the full one. A water spider collects empties on a fixed route and refills the supermarket.

The trigger must be visible from the aisle, not from inside the rack. Colour-coded empty containers, an andon light or a simple card in a holder all work; a note on a clipboard does not.

What to avoid

  • Shelving behind the operator. It looks tidy and forces a 180-degree turn every cycle.
  • Parts in bags inside boxes inside racks. Every layer adds four seconds.
  • Mixed parts in one container. Sorting at the station is a non-value operation that also creates defects.
  • Racks that block the aisle. A 1.2 m aisle becomes 0.8 m as soon as a rack is added, and the tugger route breaks.

Cost and payback

A gravity flow rack costs 200 to 600 US dollars per location, depending on width and roller type. The payback comes from reduced reaching time and reduced replenishment travel. On a line with 12 stations and a 30-second takt, saving four seconds per cycle per operator is worth roughly 13 percent of direct labour, which usually pays for the racks within a year.

The calculation is worth doing before the purchase, because it also tells you which stations deserve the expensive racks and which can keep a simple shelf.